Objectives

This WP consists of 3 tasks and is based on the design and deployment of the communication and measuring infrastructure that will support the implementation of a Wide Area Monitoring and Control (WAMC) system in Cyprus. This WP supports Specific Objective 1 and General Objective A. 

Deliverables

 D3.1: Report on the design of the communication and measuring infrastructure (UCY – Month 3) – Completed

D3.2: Demo from the implemented communication infrastructure as well as from the installed PMUs (EAC – Month 8) – Completed

D3.3: Demo illustrating how the PMU measurements are received at the control center (TSOC – Month 22) – Completed

Timing and role of partners

Months: 1-22

WP Leader: EAC


WP Participants: UCY, TSOC, Phoebe