{"id":87,"date":"2020-04-07T12:05:30","date_gmt":"2020-04-07T12:05:30","guid":{"rendered":"http:\/\/kioswebsvr1.koios.ucy.ac.cy\/enhance\/?page_id=87"},"modified":"2020-04-07T12:32:08","modified_gmt":"2020-04-07T12:32:08","slug":"workplan","status":"publish","type":"page","link":"https:\/\/www.kios.ucy.ac.cy\/enhance\/index.php\/project\/workplan\/","title":{"rendered":"Workplan"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Workplan<\/h2>\n\n\n\n<p>The project is organized in seven work packages (WP) as follows:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>WP1: Project Management<\/li><li>WP2: Dissemination &amp; Exploitation of Results<\/li><li>WP3: System Architecture<\/li><li>WP4: Novel fault ride through strategies for supporting the grid<\/li><li>WP5: Distribution Network Monitoring Tool<\/li><li>WP6: Effective Power Management techniques<\/li><li>WP7: Prototype Development and Pilot Testing<\/li><\/ul>\n\n\n\n<p>The project structure and the work package interdependencies are demonstrated below.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.kios.ucy.ac.cy\/enhance\/wp-content\/uploads\/2020\/04\/WP-1024x927.png\" alt=\"\" class=\"wp-image-88\" width=\"516\" height=\"468\" srcset=\"https:\/\/www.kios.ucy.ac.cy\/enhance\/wp-content\/uploads\/2020\/04\/WP-1024x927.png 1024w, https:\/\/www.kios.ucy.ac.cy\/enhance\/wp-content\/uploads\/2020\/04\/WP-300x272.png 300w, https:\/\/www.kios.ucy.ac.cy\/enhance\/wp-content\/uploads\/2020\/04\/WP-768x695.png 768w, https:\/\/www.kios.ucy.ac.cy\/enhance\/wp-content\/uploads\/2020\/04\/WP.png 1143w\" sizes=\"auto, (max-width: 516px) 100vw, 516px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Workplan The project is organized in seven work packages (WP) as follows: WP1: Project Management WP2: Dissemination &amp; Exploitation of Results WP3: System Architecture WP4: Novel fault ride through strategies for supporting the grid WP5: Distribution Network Monitoring Tool WP6: Effective Power Management techniques WP7: Prototype Development and Pilot Testing The project structure and the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":74,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-87","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.kios.ucy.ac.cy\/enhance\/index.php\/wp-json\/wp\/v2\/pages\/87","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.kios.ucy.ac.cy\/enhance\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.kios.ucy.ac.cy\/enhance\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.kios.ucy.ac.cy\/enhance\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.kios.ucy.ac.cy\/enhance\/index.php\/wp-json\/wp\/v2\/comments?post=87"}],"version-history":[{"count":3,"href":"https:\/\/www.kios.ucy.ac.cy\/enhance\/index.php\/wp-json\/wp\/v2\/pages\/87\/revisions"}],"predecessor-version":[{"id":124,"href":"https:\/\/www.kios.ucy.ac.cy\/enhance\/index.php\/wp-json\/wp\/v2\/pages\/87\/revisions\/124"}],"up":[{"embeddable":true,"href":"https:\/\/www.kios.ucy.ac.cy\/enhance\/index.php\/wp-json\/wp\/v2\/pages\/74"}],"wp:attachment":[{"href":"https:\/\/www.kios.ucy.ac.cy\/enhance\/index.php\/wp-json\/wp\/v2\/media?parent=87"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}