Deliverables

WP1 Project management

D1.1: Project handbook (a. draft, b. final) (Months 6/36-Public) 

D1.2: Midterm technical & financial report (for each national sub-project) (Month 18-Public) 

D1.3: Final technical & financial report (for each national sub-project) (Month 36-Public) 

WP2 Communication, dissemination and exploitation

D2.1: Communication, dissemination, and exploitation plan (Month 6-Public)

D2.2: Communication and dissemination activities and exploitation pathways (Month 36-Public)

WP3 reporting and knowledge community

D3.1: Annual and final reporting for the transnational project (Months 12/24/36-Public)

D3.2: Public abstract with the main results of the OMRES project (Month 36-Public) 

WP4 forecasting and diagnostics

D4.1: Tools for atmospheric modeling and RES power forecasting (Month 18-Public)

D4.2: Conditional monitoring and proactive control tools (Month 21-Public)

D4.3: Advanced fault diagnosis tool (Month 24-Public)

WP5 planning, operation, and control

D5.1: Tool for optimal energy storage sizing (Month 21-Public)

D5.2: Optimal bidding and control schemes (Month 27-Public)

D5.3: Inverter controllers’ library and guidelines for grid codes revision (Month 30-Public)

WP6 digital twining of grid interconnected hybrid res

D6.1: End-user needs, digital twin architecture, and scenarios definition (Month 9-Public)

D6.2: Grid-connected hybrid RES digital twin and associated OMRES platform (Month 27-Public)

D6.3: Validation and evaluation of OMRES results in a holistic Hybrid RES DT (Month 36-Public)