{"id":16,"date":"2020-04-08T08:44:57","date_gmt":"2020-04-08T08:44:57","guid":{"rendered":"http:\/\/kioswebsvr1.koios.ucy.ac.cy\/pv2grid\/?page_id=16"},"modified":"2020-04-08T09:46:14","modified_gmt":"2020-04-08T09:46:14","slug":"work-plan","status":"publish","type":"page","link":"https:\/\/www.kios.ucy.ac.cy\/pv2grid\/index.php\/work-plan\/","title":{"rendered":"Work Plan"},"content":{"rendered":"\n<p>This project aims to develop next-generation GSCs with outstanding performance, innovative operational approaches and advanced capabilities, for a seamless integration into distribution grids, enabling a large-scale deployment of PV systems. The strategic goal of the consortium is to develop working prototypes of the converters, capable of entering the market within 2-3 years of the project completion.<\/p>\n\n\n\n<p>The project is organized in eight work packages (WP).<\/p>\n\n\n\n<p>WP1: Project management<\/p>\n\n\n\n<p>WP2: Dissemination of Results<\/p>\n\n\n\n<p>WP3: Advanced Synchronization Methods<\/p>\n\n\n\n<p>WP4: Design of Enhanced Current Controllers<\/p>\n\n\n\n<p>WP5: Development of PQ controllers<\/p>\n\n\n\n<p>WP6: Profit\/Energy Scheduling Algorithm<\/p>\n\n\n\n<p>WP7: Prototyping Development<\/p>\n\n\n\n<p>WP8: Reliability and Cost Benefit Analysis<\/p>\n\n\n\n<p>The WP interdependencies and the flow of the project are shown in Fig. 1.The time schedule for each WP with the corresponding milestones (MS) are presented in Fig. 2.<\/p>\n\n\n\n<p><img fetchpriority=\"high\" decoding=\"async\" src=\"\/pv2grid\/wp-content\/uploads\/2020\/04\/WP_flow_interdependencies.png\" alt=\"\" width=\"250\" height=\"345\">&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;<img decoding=\"async\" src=\"\/pv2grid\/wp-content\/uploads\/2020\/04\/WP_Time_Schedule.png\" alt=\"\" width=\"624\" height=\"335\"><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>This project aims to develop next-generation GSCs with outstanding performance, innovative operational approaches and advanced capabilities, for a seamless integration into distribution grids, enabling a large-scale deployment of PV systems. The strategic goal of the consortium is to develop working prototypes of the converters, capable of entering the market within 2-3 years of the project [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-16","page","type-page","status-publish","hentry","potter-post"],"_links":{"self":[{"href":"https:\/\/www.kios.ucy.ac.cy\/pv2grid\/index.php\/wp-json\/wp\/v2\/pages\/16","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.kios.ucy.ac.cy\/pv2grid\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.kios.ucy.ac.cy\/pv2grid\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.kios.ucy.ac.cy\/pv2grid\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.kios.ucy.ac.cy\/pv2grid\/index.php\/wp-json\/wp\/v2\/comments?post=16"}],"version-history":[{"count":2,"href":"https:\/\/www.kios.ucy.ac.cy\/pv2grid\/index.php\/wp-json\/wp\/v2\/pages\/16\/revisions"}],"predecessor-version":[{"id":101,"href":"https:\/\/www.kios.ucy.ac.cy\/pv2grid\/index.php\/wp-json\/wp\/v2\/pages\/16\/revisions\/101"}],"wp:attachment":[{"href":"https:\/\/www.kios.ucy.ac.cy\/pv2grid\/index.php\/wp-json\/wp\/v2\/media?parent=16"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}