Work Plan
This project aims to develop next-generation GSCs with outstanding performance, innovative operational approaches and advanced capabilities, for a seamless integration into distribution grids, enabling a large-scale deployment of PV systems. The strategic goal of the consortium is to develop working prototypes of the converters, capable of entering the market within 2-3 years of the project completion.
The project is organized in eight work packages (WP).
WP1: Project management
WP2: Dissemination of Results
WP3: Advanced Synchronization Methods
WP4: Design of Enhanced Current Controllers
WP5: Development of PQ controllers
WP6: Profit/Energy Scheduling Algorithm
WP7: Prototyping Development
WP8: Reliability and Cost Benefit Analysis
The WP interdependencies and the flow of the project are shown in Fig. 1.The time schedule for each WP with the corresponding milestones (MS) are presented in Fig. 2.